Open Decisions Inc. logo
Head Office: 3950 14th Avenue, Unit 304, Markham, ON. L3R-0A9 Canada. Tel: 1.647.931.3090
Log in | Contact Us | Follow Us   Linkedin Icon Blogspot Icon Facebook icon
HomeProducts & SolutionsSolutionsProfessional ServiceApplication Readiness Service ARS
products and solutions

Application Readiness Service (ARS)

ARS provides outstanding flexibility and affordability, with the necessary expert project management, configuration, and testing to get new server and storage systems ready for the installation of applications within a robust and demanding environment.

Project initiation: ARS begins with a review of the conditions and prerequisites for service delivery. conducts a project kickoff meeting with key contacts to finalize the project approach and discuss roles, responsibilities, and the work schedule. A project schedule and general time frames for service delivery are set, which may include additional meetings and identification of specific milestones as necessary.

Consulting and design: After conducting the kickoff meeting, we will hold a series of meetings to design the architecture of the server domains and the applications that will reside on them. During these meetings, our technology experts focus on maximizing the availability of the platform.

Configuration and testing: We will complete the server configuration and perform a series of basic functional tests to verify conformance with the design specification. Configuration and testing may include activities of dynamic reconfiguration testing, system storage multipathing and availability tests for StorageTek Traffic Manager, network availability tests for IP multipathing, and security-related test procedures for domain hardening.

Key Features

  • Architecture and design consulting to maximize server availability
  • Custom configuration and implementation to help meet your business needs
  • Application review, system availability test, and operational handover for a smooth transition

Key Benefits

  • Expert guidance that helps reduce risk and improve return on investment by configuring the system right the first time
  • Save time and money by expediting system deployment and optimizing overall performance
  • Verify the proper configuration of availability and recoverability features through a formal testing methodology prior to handoff
About Us Contact Us | News & Events
Computing Platform Cisco UCS | Hitachi Server and Blade Center | HP ProLiant Blade Center | IBM Power Serial | Lenovo Think Server |
Data Center Open Network © 42U Computer Cabinet | Open Network © GREEN BOX
Network CISCO Network Router and Switch | D-Link Unified WIFI | F5 Load-Balancer
Storage HDS HUS Storage | IBM Mid-Range Storage | NetApp Storage
Backup and DR Symantec Enterprise Vault | Symantec NetBackup
Managed Service Cloud Storage
Media OpenMedia
Trading CFIE | OpenTrade
Professional Service Application Readiness Service ARS | Enterprise Installation Service EIS | IT Management and Support IMS
Telecommunication Open Network © IPv6 Gateway | Open Network © Location Based Services
Virtualization Virtual Desktop VDI | VMware
Training ODI Training
Our Business Partners

oracle gold partner logo ibm logo hp logo lenovo for those who do logo cisco netapp gold partner hitachi data systems dell registered partner symantec gold partner vmware red hat eaton authorized power advantage partner f5 open 6 network d-link registered partner huawei partner xirrus gold partner aruba partner

Web Site Terms of Use | Privacy Policy | Site Map Copyright © Open Decisions Inc. 2009-2018. All rights reserved.
All times are EST. The time now is 01:06 AM.